05.TM048 - End of Job Checklist
Metron Group  05.TM048 - End of Job Checklist

: 05.TM048 - End of Job Checklist
: 
:05 - Operations
:
:
: 
: 
  :

  ()
04.PR008 Invoicing and Closing Out 1.1 Check and update systems
- Check all project documentation is complete, as per the PDP
- Check Share to ensure all issued documents have been uploaded to the project site
- Check document register to ensure there are no documents left in draft for the project
- Check any mobilisations in ERP to ensure dates are correct - check against offshore timesheets if unsure
- Check all tasks are completed in the project and move the project to closed. Any remaining tasks must be completed before the project can be close out.
- If equipment was sent offshore, ensure all mobilisation records have been uploaded to the system, the asset register is up to date and all equipment has been returned.
- If any deliveries were made for the project, ensure all delivery notes and photos have been uploaded to the system

Project Planner and Controller and Team Lead