05.PR002 BINDT Training Management |
3.4 Download Training Room checklist Download checklist, fill in details and save in relevant project folder on Share.
A project folder is created for all training delivery programmes. |
Project Planner and Controller and Team Lead
|
05.PR005 Training course being delivered at Metron by Metron personnel or contractor |
2.1 Download Checklist Download checklist, fill in details and save in Operations project folder. |
Project Planner and Controller and Team Lead
|
05.PR005 Training course being delivered at Metron by Metron personnel or contractor |
2.5 Collate documentation Print off all required documentation, including course material |
Project Planner and Controller and Team Lead
|
05.PR005 Training course being delivered at Metron by Metron personnel or contractor |
2.8 Carry out training/board room preparation Carry out room preparation as per the Metron Delivery - Training Checklist |
Project Planner and Controller and Team Lead
|
05.PR005 Training course being delivered at Metron by Metron personnel or contractor |
3.1 Course delivery Carry out course delivery as per the Metron Delivery - Training Checklist. |
Project Planner and Controller and Team Lead
|
05.PR005 Training course being delivered at Metron by Metron personnel or contractor |
3.3 Facilitate for the duration of course Ensure snacks and lunches are ready at appropriate intervals and that rooms are cleaned at the end of each day. If the course is more than one day, ensure all preparations are made on each day, as per sections 3.3. Once course is complete, proceed to 4.
|
Project Planner and Controller and Team Lead
|
05.PR005 Training course being delivered at Metron by Metron personnel or contractor |
3.4 End of course Carry out end of course delivery as per the Metron Delivery - Training Checklist. |
Project Planner and Controller and Team Lead
|
05.PR008 Organisation of training held at Metron by a third party |
2.1 Download Checklist Download checklist, fill in details and save in Operations project folder. |
Project Planner and Controller and Team Lead
|
05.PR008 Organisation of training held at Metron by a third party |
4.3 Facilitate for the duration of course Ensure snacks and lunches are ready at appropriate intervals and that rooms are cleaned at the end of each day.
If the course is more than one day long, ensure all preparations are made on each day, as per sections 3.2 and 4.3. Once course is complete, proceed to 5. |
Project Planner and Controller and Team Lead
|