05.TM046 - Training Room Hire - Checklist (External)
Metron Group  05.TM046 - Training Room Hire - Checklist (External)

: 05.TM046 - Training Room Hire - Checklist (External)
: 
:05 - Operations
:
:
: 
: 
  :

  ()
05.PR002 BINDT Training Management 3.4 Download Training Room checklist
Download checklist, fill in details and save in relevant project folder on Share.

A project folder is created for all training delivery programmes.

Project Planner and Controller and Team Lead
05.PR005 Training course being delivered at Metron by Metron personnel or contractor 2.1 Download Checklist
Download checklist, fill in details and save in Operations project folder. 

Project Planner and Controller and Team Lead
05.PR005 Training course being delivered at Metron by Metron personnel or contractor 2.5 Collate documentation
Print off all required documentation, including course material

Project Planner and Controller and Team Lead
05.PR005 Training course being delivered at Metron by Metron personnel or contractor 2.8 Carry out training/board room preparation
Carry out room preparation as per the Metron Delivery - Training Checklist

Project Planner and Controller and Team Lead
05.PR005 Training course being delivered at Metron by Metron personnel or contractor 3.1 Course delivery
Carry out course delivery as per the Metron Delivery - Training Checklist. 

Project Planner and Controller and Team Lead
05.PR005 Training course being delivered at Metron by Metron personnel or contractor 3.3 Facilitate for the duration of course
Ensure snacks and lunches are ready at appropriate intervals and that rooms are cleaned at the end of each day.
If the course is more than one day, ensure all preparations are made on each day, as per sections 3.3. Once course is complete, proceed to 4.


Project Planner and Controller and Team Lead
05.PR005 Training course being delivered at Metron by Metron personnel or contractor 3.4 End of course
Carry out end of course delivery as per the Metron Delivery - Training Checklist.

Project Planner and Controller and Team Lead
05.PR008 Organisation of training held at Metron by a third party 2.1 Download Checklist
Download checklist, fill in details and save in Operations project folder.

Project Planner and Controller and Team Lead
05.PR008 Organisation of training held at Metron by a third party 4.3 Facilitate for the duration of course
Ensure snacks and lunches are ready at appropriate intervals and that rooms are cleaned at the end of each day.

If the course is more than one day long, ensure all preparations are made on each day, as per sections 3.2 and 4.3. Once course is complete, proceed to 5. 

Project Planner and Controller and Team Lead