56.PR002 CNR Mobilisation of Equipment by Sea 1.1 Check CNR logistics information to identify correct sailing
Sailings should be chosen so that equipment arrives offshore in time to complete the scope, but so that hire costs are reduced for CNR where possible (i.e. On hire equipment not to be sent several weeks before it is required. Check daily sailing reports sent by CNR

Note: Cargo booking cut off time is 12.00pm the day before sailing

If equipment is urgently required or will not make if offshore in time for required scope see Mobilisation of Equipment by Air process. This should be discussed with the CNR point of contact.


Project Planner and Controller and Team Lead