Metron Group
14.TM023 - Metron Visitor Induction Checklist
Metron Group  14.TM023 - Metron Visitor Induction Checklist

: 14.TM023 - Metron Visitor Induction Checklist
: 
:13/14 - QHSE
:
:
: 
: 
  :

  ()
05.PR003 BINDT Examination 3.1 Site Induction of students
The Project planner and controller and Invigilator, should make themselves known to the delegates upon arrival at the premises, and advise on how they can be contacted during their time on-site.

All delegates must be given a Visitor Health & Safety Information leaflet when they arrive on site, detailing Fire Evacuation Plans, First Aid, Accident Reporting and House Rules.

Point out the emergency contact information displayed on the notice boards and provide the location of washroom services.

Complete the Metron Visitor Induction Checklist for each delegate.


Project Planner and Controller and Team Lead
14.PR015 Contractor health and safety management 1.6 Visitor Information
The Responsible Staff Member, (and technical point of contact, if required), should make themselves known to the contractors upon arrival at the premises, and advise on how the Responsible Staff Member may be contacted during their time on-site.

All contractors must be given a Visitor Health & Safety Information leaflet when they arrive on site, detailing Fire Evacuation Plans, First Aid, Accident Reporting and House Rules.

Point out the emergency contact information displayed on the notice boards and provide the location of washroom services.

Responsible Staff Member