10.PR001 Network Infrastructure Management 2.1 Review current network infrastructure capacity
Things to consider when reviewing the network infrastructure:
-Network speed
-Additional software and hardware required
-Router/switch/patch panel capacity
-IPs available
-Server capacity
-NAS capacity

Business Systems Manager
10.PR002 Control of ISD Assets 2.2 Complete change request
If the item has changed the network infrastructure, a change request should be completed to update the relevant documents including the access doc.

Business Systems Manager