Metron Group
Lead CBM Engineer
Metron GroupLead CBM Engineer

: Lead CBM Engineer
: 05 - Operations - GENERIC
:
:  
:   
:  
  ()
52.PR002 MOUK Inducting New Metron Personnel 1.2 Familiarisation with MOUK's hazard reporting system
52.PR004 MOUK Collecting Adhoc Data 3.7 Review workscope
  6.4 Review report
52.PR005 MOUK Collecting Routine VibXpert Data 3.8 Review workscope
  6.4 Review CM report
52.PR006 MOUK Managing CM Programme Delivery 2.4 Identify appropriate CM frequencies
  ()
52.PR002 MOUK Inducting New Metron Personnel 1.2 Familiarisation with MOUK's hazard reporting system
52.PR004 MOUK Collecting Adhoc Data 1.6 Inform MOUK of mobilising engineer & vantage number
  1.7 Inform MOUK if it is Engineer's first visit to Asset
  2.2 Review historical reports
  3.6 Create workscope with reference to any MOUK procedures and Metron's Pump Performance Procedure
  3.7 Review workscope
  3.8 Approve workscope
  3.9 Issue workscope to MOUK
  4.9 Provide written daily reporting to MOUK
  5.5 Issue site report
  6.1 Upload latest version of CM database
  6.2 Carry out full review of data collected
  6.4 Review report
  6.5 Approve report
  6.6 Issue report
  6.7 Update Exceptions Tracker
  6.8 Meet with MOUK's onshore representative to discuss findings and actions
52.PR005 MOUK Collecting Routine VibXpert Data 1.6 Inform MOUK of mobilising engineer & vantage number
  1.7 Inform MOUK if it is Engineer's first visit to Asset
  2.4 Update Exception Tracker
  3.1 Identify priorities for visit
  3.7 Create workscope with reference to any MOUK procedures and Metron's Pump Performance Procedure
  3.8 Review workscope
  3.9 Approve workscope
  3.10 Issue workscope to MOUK
  4.9 Provide written daily reporting to MOUK
  5.5 Issue site report
  6.1 Upload latest version of CM database
  6.2 Carry out full review of data collected
  6.4 Review CM report
  6.5 Approve CM report
  6.6 Issue CM report
  6.7 Update Exceptions Tracker
  6.8 Meet with MOUK's onshore representative to discuss findings and actions
  6.9 Update MOUK's SAP
52.PR006 MOUK Managing CM Programme Delivery 2.1 Identify any existing monitoring
This can include online monitoring
  2.2 Identify appropriate CM techniques
  2.3 Identify parameters to be measured
  2.4 Identify appropriate CM frequencies
  2.5 Identify cost of CM implementation
  2.6 Identify measurement locations
  3.2 Set initial Alarm/Danger levels
  3.5 Review data to diagnose any faults
  3.6 Carry out any further testing required to confirm diagnosis
  4.2 Identify priority of repair
  4.3 Discuss findings with MOUK
  4.4 Raise notiification in MOUK SAP system
  4.6 Take measurements to confirm problem is resolved
  5.2 Carry out RCA if required
  5.3 Refine Alarm/Danger setpoints based upon historical data
  5.4 Measure success of CM programme