52.PR004 MOUK Collecting Adhoc Data 2.1 Gather any drawings, manuals or other required information
  2.2 Review historical reports
  3.1 Identify any equipment required to be mobilised for visit
  3.3 Confirm equipment availability
  3.4 Confirm equipment is calibrated. Refer to Metron's equipment calibration process
  3.5 Verify equipment's functionality
  3.6 Create workscope with reference to any MOUK procedures and Metron's Pump Performance Procedure
  3.14 Identify any additional PPE required for mobilisation
  3.15 Download latest version of CM database
  3.16 Make any additions needed to CM database
  4.1 Contact MOUK logistics for check-in time
  4.2 Complete any required site inductions
  4.3 Meet with MOUK's site representative to discuss workscope
  4.4 Collect any equipment from offshore stores
  4.5 Attend MOUK's daily morning briefing
  4.6 Collect work permit for carrying out work
  4.7 Satisfy yourself that work permit is suitable and covers all tasks to be completed. If in any doubt, stop the job.
  4.8 Carry out routine data collection
  4.9 Provide written daily reporting to MOUK
  4.10 Close out work permit on completion of job
  5.1 Meet with MOUK's site representative to discuss initial findings and any issues requiring immediate attention
  5.2 Prepare equipment for return to Metron
  5.3 Deliver equipment to site stores
  5.4 Ensure all paperwork is completed for equipment return
  5.5 Issue site report
  5.6 Submit signed timesheet
  6.1 Upload latest version of CM database
  6.2 Carry out full review of data collected
  6.3 Write report
  6.6 Issue report
  6.7 Update Exceptions Tracker
  6.8 Meet with MOUK's onshore representative to discuss findings and actions
52.PR005 MOUK Collecting Routine VibXpert Data 2.1 Review previous month's report
  2.2 Review Exception Tracker
  2.3 Check MOUK's SAP for updates to WOs related to open Exceptions
  2.4 Update Exception Tracker
  3.1 Identify priorities for visit
  3.2 Identify any equipment required to be mobilised for visit
  3.4 Confirm equipment availability
  3.5 Confirm equipment is calibrated. Refer to Metron's equipment calibration process
  3.6 Verify equipment's functionality
  3.7 Create workscope with reference to any MOUK procedures and Metron's Pump Performance Procedure
  3.15 Identify any additional PPE required for mobilisation
  3.16 Download latest version of CM database
  4.1 Contact MOUK logistics for check-in time
  4.2 Complete any required site inductions
  4.3 Meet with MOUK's site representative to discuss workscope
  4.4 Collect any equipment from offshore stores
  4.5 Attend MOUK's daily morning briefing
  4.6 Collect work permit for carrying out work
  4.7 Satisfy yourself that work permit is suitable and covers all tasks to be completed. If in any doubt, stop the job.
  4.8 Carry out routine data collection
  4.9 Provide written daily reporting to MOUK
  4.10 Close out work permit on completion of job
  5.1 Meet with MOUK's site representative to discuss initial findings and any issues requiring immediate attention
  5.2 Prepare equipment for return to Metron
  5.3 Deliver equipment to site stores
  5.4 Ensure all paperwork is completed for equipment return
  5.5 Issue site report
  5.6 Submit signed timesheet
  6.1 Upload latest version of CM database
  6.2 Carry out full review of data collected
  6.3 Write CM report
  6.6 Issue CM report
  6.7 Update Exceptions Tracker
  6.8 Meet with MOUK's onshore representative to discuss findings and actions
  6.9 Update MOUK's SAP
52.PR006 MOUK Managing CM Programme Delivery 3.1 Measure baseline level
  3.3 Take measurements
Routine VX
  3.4 Compare overall levels with setpoints and previous measurements
  3.5 Review data to diagnose any faults
  3.6 Carry out any further testing required to confirm diagnosis
  4.1 Identify maintenance required to rectify fault
  4.2 Identify priority of repair
  4.3 Discuss findings with MOUK
  4.4 Raise notiification in MOUK SAP system
  4.6 Take measurements to confirm problem is resolved
  ()
52.PR004 MOUK Collecting Adhoc Data 1.1 Check engineer availability
  1.2 Confirm any required MOUK onshore inductions are completed
  1.3 Confirm BOSIET up to date
  1.4 Confirm offshore medical up to date
  1.5 Confirm MIST up to date
  2.1 Gather any drawings, manuals or other required information
  2.2 Review historical reports
  3.1 Identify any equipment required to be mobilised for visit
  3.3 Confirm equipment availability
  3.4 Confirm equipment is calibrated. Refer to Metron's equipment calibration process
  3.5 Verify equipment's functionality
  3.6 Create workscope with reference to any MOUK procedures and Metron's Pump Performance Procedure
  3.7 Review workscope
  3.8 Approve workscope
  3.9 Issue workscope to MOUK
  3.10 Issue equipment mobilisation request to MOUK
  3.11 Identify required delivery/shipping dates for equipment
  3.12 Prepare equipment for mobilisation
  3.13 Deliver equipment to MOUK's logistic provider
  3.14 Identify any additional PPE required for mobilisation
  3.15 Download latest version of CM database
  3.16 Make any additions needed to CM database
  4.1 Contact MOUK logistics for check-in time
  4.2 Complete any required site inductions
  4.3 Meet with MOUK's site representative to discuss workscope
  4.4 Collect any equipment from offshore stores
  4.5 Attend MOUK's daily morning briefing
  4.6 Collect work permit for carrying out work
  4.7 Satisfy yourself that work permit is suitable and covers all tasks to be completed. If in any doubt, stop the job.
  4.8 Carry out routine data collection
  4.9 Provide written daily reporting to MOUK
  4.10 Close out work permit on completion of job
  5.1 Meet with MOUK's site representative to discuss initial findings and any issues requiring immediate attention
  5.2 Prepare equipment for return to Metron
  5.3 Deliver equipment to site stores
  5.4 Ensure all paperwork is completed for equipment return
  5.5 Issue site report
  5.6 Submit signed timesheet
  6.1 Upload latest version of CM database
  6.2 Carry out full review of data collected
  6.3 Write report
  6.4 Review report
  6.6 Issue report
  6.7 Update Exceptions Tracker
  6.8 Meet with MOUK's onshore representative to discuss findings and actions
52.PR005 MOUK Collecting Routine VibXpert Data 1.1 Check engineer availability
  1.2 Confirm any required MOUK onshore inductions are completed
  1.3 Confirm BOSIET up to date
  1.4 Confirm offshore medical up to date
  1.5 Confirm MIST up to date
  2.1 Review previous month's report
  2.2 Review Exception Tracker
  2.3 Check MOUK's SAP for updates to WOs related to open Exceptions
  2.4 Update Exception Tracker
  3.1 Identify priorities for visit
  3.2 Identify any equipment required to be mobilised for visit
  3.4 Confirm equipment availability
  3.5 Confirm equipment is calibrated. Refer to Metron's equipment calibration process
  3.6 Verify equipment's functionality
  3.7 Create workscope with reference to any MOUK procedures and Metron's Pump Performance Procedure
  3.8 Review workscope
  3.9 Approve workscope
  3.10 Issue workscope to MOUK
  3.11 Issue equipment mobilisation request to MOUK
  3.12 Identify required delivery/shipping dates for equipment
  3.13 Prepare equipment for mobilisation
  3.14 Deliver equipment to MOUK's logistic provider
  3.15 Identify any additional PPE required for mobilisation
  3.16 Download latest version of CM database
  4.1 Contact MOUK logistics for check-in time
  4.2 Complete any required site inductions
  4.3 Meet with MOUK's site representative to discuss workscope
  4.4 Collect any equipment from offshore stores
  4.5 Attend MOUK's daily morning briefing
  4.6 Collect work permit for carrying out work
  4.7 Satisfy yourself that work permit is suitable and covers all tasks to be completed. If in any doubt, stop the job.
  4.8 Carry out routine data collection
  4.9 Provide written daily reporting to MOUK
  4.10 Close out work permit on completion of job
  5.1 Meet with MOUK's site representative to discuss initial findings and any issues requiring immediate attention
  5.2 Prepare equipment for return to Metron
  5.3 Deliver equipment to site stores
  5.4 Ensure all paperwork is completed for equipment return
  5.5 Issue site report
  5.6 Submit signed timesheet
  6.1 Upload latest version of CM database
  6.2 Carry out full review of data collected
  6.3 Write CM report
  6.4 Review CM report
  6.6 Issue CM report
  6.7 Update Exceptions Tracker
  6.8 Meet with MOUK's onshore representative to discuss findings and actions
  6.9 Update MOUK's SAP
52.PR006 MOUK Managing CM Programme Delivery 2.1 Identify any existing monitoring
This can include online monitoring
  2.2 Identify appropriate CM techniques
  2.3 Identify parameters to be measured
  2.4 Identify appropriate CM frequencies
  2.5 Identify cost of CM implementation
  2.6 Identify measurement locations
  3.1 Measure baseline level
  3.2 Set initial Alarm/Danger levels
  3.3 Take measurements
Routine VX
  3.4 Compare overall levels with setpoints and previous measurements
  3.5 Review data to diagnose any faults
  3.6 Carry out any further testing required to confirm diagnosis
  4.1 Identify maintenance required to rectify fault
  4.2 Identify priority of repair
  4.3 Discuss findings with MOUK
  4.4 Raise notiification in MOUK SAP system
  4.6 Take measurements to confirm problem is resolved
  5.1 Carry out inspection on failed parts
  5.2 Carry out RCA if required
  5.3 Refine Alarm/Danger setpoints based upon historical data